/ by /   POOL OPENINGS / 0 comments

New Inground Pools Initial Water Treatment

Day 1

As soon as you have water in your pool…
Pour around the pool perimeter 1 L of Pioneer ‘s STAIN & SCALE CONTROL

As soon as the water is circulating and your filter is clean…
Hang or suspend a double-layered leg of pantyhose filled with 1kg (4 cups) of Pioneer’s STABILIZER from the ladder and leave there until dissolved. To expedite the process, you can occasionally go out and knead the stocking.

Immediately after adding the stabilizer…
Broadcast 1 kg (4 cups) of Pioneer’s OXIDIZER over the pool water surface

In the evening, at least 2 hours after adding the oxidizer…
Broadcast 2 pouches (s/m) 3 pouches (L/XL) of HTH EXTRA across the pool water surface

Day 2

Add 1L of CONCENTRATED ALGAECIDE
To a pail of water and pour around the perimeter of the pool

Immediately after adding the algaecide…

Drop 1-2 CLARITABS into the skimmer basket

Begin daily chlorination…
By filling the Automatic Chlorinator with 5-7 stabilized chlorine pucks. Set the control valve on the chlorinator to 2 or 3.

With filter running…
Add the entire contents of the Phosfree (step1) bottle directly into the skimmer. Run your filter for a minimum of 8 hours per day for 1 week of continually for 48 hours. At the end of this procedure you can begin with “Pool Perfect with Phosfree” (step 2 maintenance) as per instructions on bottle)

If you have a Nature 2 unit…
Install the new cartridge and start Nature 2 by following our Nature 2 Set-Up sheet

48 hours after you have completed the steps for “Day 2” visit Pioneer to have your water professionally tested.

SHARE THIS